3 Blue Marlin and a Sailfish one day out of MHC and 750+ Blue 17 Whites out of Pirates Cove
Occupation
Paying for my habit
LAST WINTERS PROJECT
LAST WINTER THE TROPHY A 1973 46 EGG HARBOR WENT THROUGH A 2 MONTH RE FIT. STARTING WITH THE STBD. ENG BEING REBUILT A PAINT JOB FROM THE BOOT STRIPE UP SOME WOOD REPAIR AND INTERIOR ALONG WITH EXTERIOR CUSTOM WORK. HERE ARE SOME PICTURES POSTED IN THE PHOTO GALLERY STILL TRYING TO FIGURE OUT HOW TO MOVE THEM OVER TO THIS POST I'LL POST THE FINISHED PRODUCT LATER.
I just found the goodies. A small vid is being uploaded and I will ask Jer to place it here for you. Tricky little pictures did not want to cooperate with Box or Flat. But we pulled it off
3 Blue Marlin and a Sailfish one day out of MHC and 750+ Blue 17 Whites out of Pirates Cove
Occupation
Paying for my habit
THANKS FLAT, BOX, AND JER MAN I HAD A HARD TIME GETTING THOSE IMAGES OUT OF MY COMPUTER SHOULD HAVE SOME PICS OF THE FINISHED PRODUCT COMING THIS WEEKEND.
3 Blue Marlin and a Sailfish one day out of MHC and 750+ Blue 17 Whites out of Pirates Cove
Occupation
Paying for my habit
HERE ARE A FEW MORE UPDATED PICS I'M GETTING THE BOTTOM SODA BLASTED NEXT WEEK TIME TO SHED 34 YRS. OF MICRON. I'LL HAVE SOME INTERIOR PICS AND ENGINE ROOM SHOTS UP SOON ALONG WITH IN WATER AND COCKPIT SHOTS TO.